Post-construction cleaning in Hesse – handover-ready on your handover date
Rough, fine and final cleaning after new builds, conversions and refurbishments. We plan backwards from the acceptance date – also at night and at weekends, so that the handover holds. For developers, general contractors, property managers and commercial clients throughout Hesse.
Post-construction cleaning is the cleaning carried out at the end of construction in three phases – rough, fine and final cleaning – so that a new build or refurbished area can be handed over ready for acceptance and occupancy. Ferman Industrieservice carries it out throughout Hesse for commerce, industry and residential complexes: on schedule for the handover date, also at night and at weekends, with a fixed-price quote within 24 hours.
- 24/7
- Jobs around the clock: at night, at weekends, on Sundays and public holidays
- Large teams
- Enough personnel, even at short notice – for major projects and shutdowns
- Throughout Hesse
- Based in Bad Soden-Salmünster, jobs throughout Hesse and the Rhine-Main area
- A to Z
- Every job professionally documented, fixed-price quote after a site inspection
Phases of post-construction cleaning
Professional post-construction cleaning follows a clear three-stage model. Each phase builds on the previous one and prepares the building professionally for acceptance, handover and use.
1. Rough construction cleaning
Rough construction cleaning begins immediately after the building work is completed. This removes building rubble, packaging material, film, coarse dust and leftover building materials. Floors are swept, coarse deposits are removed from window sills and stairs. The aim is to bring the site to a condition that makes the next phase possible in the first place.
2. Fine construction cleaning
In the second phase, construction dust, mortar residues, paint and adhesive residues, silicone traces and plaster deposits are removed from all surfaces. This affects floors, walls, ceilings, windows, radiators, ventilation grilles and fixtures. For stubborn residues, suitable cleaning agents and professional equipment are used gently on materials.
3. Final cleaning (acceptance cleaning)
Final cleaning is the last step before handover or acceptance. Windows are cleaned streak-free inside and out, floors polished or sealed, washrooms disinfected, all fittings brought to a high shine. After final cleaning the building is ready for occupancy and acceptance. We coordinate the timing of the final cleaning closely with your acceptance date.
Scope of services in detail
Our post-construction cleaning covers all areas of a building, from the underground car park to the attic, from the entrance hall to the plant rooms.
- Construction dust & rubble: Thorough removal of building material deposits, coarse rubble, packaging and film
- Window cleaning: Inside and out, frames, window sills, roller shutter boxes, streak-free and ready for acceptance
- Floor cleaning: Removal of paint, mortar and adhesive residues, followed by cleaning, polishing or sealing depending on the floor covering
- Sanitary facilities: Deep cleaning, descaling and disinfecting of toilets, washbasins, showers, fittings
- Doors, frames, railings: Removal of protective film, adhesive residues, fingerprints, final polishing
- Radiators & ventilation: Thorough cleaning inside and out, removal of construction dust from ventilation slots
- Walls & ceilings: Removal of splashes, stains, formwork residues and construction dust from all accessible surfaces
- Stairwells & traffic routes: Complete cleaning incl. railings, landings, treads
When does post-construction cleaning make sense?
Professional post-construction cleaning is always required when a building or part of a building is handed over to the user, tenant or client after construction work. Before acceptance or handover, a final or fine construction clean is often agreed so that construction-related soiling is removed and the surfaces are prepared for the final inspection.
New build
After completion of a new build or shell construction. Before first-occupancy handover to tenants or buyers.
Conversion & refurbishment
After interior fit-out, renovation or full refurbishment. Also for partial refurbishment of individual floors or areas.
Before acceptance & handover
As the last measure before the acceptance protocol. A clean handover reduces defect notices and demands for rectification.
Commerce & industry
For commercial new builds, hall construction, office complexes or production buildings, often under time pressure and with strict quality requirements.
Checklist: 7 days to acceptance
Most handover problems arise not during cleaning but before it. This is how we plan with you:
- 1Plan the schedule backwardsSet the acceptance date, fine cleaning 2–3 days before, final cleaning the day before or on the morning of handover.
- 2Complete the tradesPainters, floor layers and electricians should be finished before fine cleaning – otherwise new dust is created.
- 3Clarify protective filmWho removes film from windows, doors and floors? We are happy to take this on if it is part of the order.
- 4Power, water, lightFor final cleaning we need a water and power supply and adequate lighting.
- 5Access and keysAgree keys, access and an on-site contact person – especially for night and weekend jobs.
- 6Joint acceptanceOn request we walk through together before handover and document the condition with photos.
Post-construction cleaning throughout Hesse
From our base in Bad Soden-Salmünster we operate throughout Hesse – in the Rhine-Main area as well as in northern and eastern Hesse, including in Frankfurt, Hanau, Offenbach, Darmstadt, Wiesbaden, Gießen and Fulda. You will find all locations by postcode under Post-construction cleaning by postcode.
We know what developers, general contractors and property managers expect at acceptance. For large properties we come with large teams and work floor by floor or in parallel. After handover we can, on request, take over the ongoing Regular maintenance cleaning or Window and glass cleaning. We clean new-build halls using the same techniques as for Hall cleaning. More background in the Post-construction cleaning guide.
Frequently asked questions
What does post-construction cleaning involve?▼
Post-construction cleaning runs in three phases: rough construction cleaning (building rubble, packaging, film), fine construction cleaning (construction dust, paint, mortar and adhesive residues) and final cleaning (streak-free windows, floors, sanitary facilities, doors and fixtures). Afterwards the property is ready for acceptance and occupancy.
What does post-construction cleaning cost?▼
That depends on the area, the level of soiling, the proportion of windows, the floor coverings and the number of cleaning phases. After a site visit, or based on plans and photos, you will receive a binding fixed-price quote – within 24 hours.
Do you also work at short notice, at night and at weekends?▼
Yes. Acceptance dates are often under time pressure. We are available 24/7, get back to you in under 2 hours and work at night, at weekends and on public holidays if needed – with enough personnel to keep your handover date.
How long does post-construction cleaning take?▼
That depends on area, soiling and number of phases. For large properties we work with several teams in parallel or floor by floor. We will give you the exact duration as a binding figure in the quote after the walkthrough.
For which properties do you offer post-construction cleaning?▼
For office buildings, production and warehouse halls, retail space, medical practices, hotels, schools, residential complexes and special properties such as multi-storey car parks – after new construction, conversion or refurbishment, throughout Hesse.
Do you also take care of disposing of building rubble?▼
We collect loose remains and coarse material residues as part of the rough construction cleaning and make them ready for disposal. Landfill and skip costs are not automatically included and are shown separately in the quote.
What happens if defects are still noticed at acceptance?▼
Before handover we inspect all rooms ourselves. If something is still noticed at acceptance, we rectify it at short notice. On request we document the condition with photos – helpful in disputes between trades.